Treatment Plant Equipment & Mechanical Erection

From screens to sludge dewatering: built in our own workshop, erected and commissioned on site.

Equipment & Mechanical Installations

We manufacture the mechanical equipment of treatment plants in our workshop in OSTİM, supply pumps, blowers and dosing equipment, and erect everything on site. For contractors and utilities we take on either equipment supply only, or supply together with piping, erection and commissioning. When existing plants are refurbished or expanded, we replace old equipment with new.

Key features

  • Manufactured and quality-checked in our own workshop
  • Carbon steel, hot-dip galvanised or stainless steel
  • Supply only, or turnkey with erection
  • Equipment renewal and refurbishment of existing plants

How does it work?

How does it work?

  1. 01

    An equipment list and data sheets are prepared to the design and specification.

  2. 02

    Shop drawings are submitted for approval and materials (carbon steel, galvanised, stainless) are confirmed.

  3. 03

    Equipment is built in our workshop and passes factory acceptance tests.

  4. 04

    Mechanical erection, piping and alignment are carried out on site.

  5. 05

    Commissioning with electrical and automation works, performance tests and operator training complete the job.

References

Our references in this field

Municipal / public water

Konya WWTP Mechanical Equipment

Konya, Türkiye · 1991–1995

Mekanik ekipman

Municipal / public water

İller Bankası Drinking Water Plants Mechanical Equipment

Keşan · Erdek · Çubuk · Aliağa · Şile · Aydın · Kırklareli, Türkiye · 1992–1997

Proje, imalat ve montaj

Industry

Marmara Dissolved Air Flotation (DAF) System

Marmara, Türkiye · 2026–

3.000 m³/saat

Industry

Karachi Power Plant Process Water Treatment – DAF System

Karaçi, Pakistan · 2019–2021

1.500 m³/saat

Municipal / public water

İSKİ Elmalıdere Pump Station Sluice Gates

İstanbul, Türkiye · 1997

Sürgülü kapak

Industry

Turkish Aerospace (TAI) WWTP Screen Structure

Ankara, Türkiye · 1996

Izgara yapısı

See references

Let’s talk about your project

Share the flow, sector and discharge point — our engineers will reply with a preliminary assessment within 2 business days.